| Licensed Installed Capacity |
410 MW |
| Installed Capacity on Site |
410 MW |
| Production Units |
|
| Gas Turbines |
7 |
| Steam Turbines |
2 |
| Gas Turbines |
|
| LM5000 GE 1993 |
48,5 MW |
| FR-6 GE 1996 |
41 MW |
| LM6000-1 GE 1998 |
47 MW |
| LM6000-2 GE 2003 |
46,5 MW |
| LM6000-3 GE 2004 |
46,5 MW |
| LM6000-4 GE 2005 |
46,5 MW |
| LM6000-5 GE 2006 |
48 MW |
| TOTAL |
324 MW |
| Steam Turbines |
|
| ST.1 GE 1999 |
43/45 MW |
| ST.2 GE 2007 |
43/45 MW |
| TOTAL |
86 MW |
| TOTAL of Production Groups |
410 MW |
| Production Group |
2 |
| 1. Production group installed capacity |
179,5 MW |
| 2. Production group installed capacity |
182,5 MW |
| Backup unit |
48 MW |
| Availability |
% 96 |
| Reliability |
% 98 |
| Projected ability of yearly production |
3.500.000.000 Kwh |
| Gross energy amount for planned capacity |
3.065.000.000 Kwh |
| Natural Gas consumption (maximum) |
650.000.000 sm3 |
| Natural Gas consumption (minumum) |
400.000.000 sm3 |
| Combined Cycle Efficiency (average) |
% 50 |
| Number of Personnel |
87 |
| Available Capacity for selling heat-steam to surrounding factories |
| Steam 6bar 170°C |
450.000 t/year |
| Hot Water 5bar 90-100°C |
750.000 t/year |